The final section of the Jackson River Scenic Trail was supposed to be opened in spring 2023, but environmental and construction delays postponed the projected opening to spring 2024. Then a "high water event" in January 2024 caused part of the almost-finished trail to collapse.
This trail section had to be re-engineered, completely removed, then rebuilt. It finally opened in November 2024.
![]() |
| The rebuilt section has new drainage structures and wall stabilization. |
![]() |
| From the other end. |
![]() |
| There's still a bit of silt entering the water after significant rain. |
![]() |
| A nice set of rapids on Cedar Creek. |
![]() |
| Water exiting a cave along the stream bank. |
![]() |
| A closer view of the cave entrance. |
![]() |
| Looking north along Cedar Creek to the new Cedar Creek Trailhead. |









No comments:
Post a Comment